
The whole complex is spread over an area of 34 hectares (84 acres) which is again wrapped around by a green belt of 10 hectares (24.7 acre). Several mass-graves and a reflection water body are placed in front of the monument. Once one enters the complex through the main gate he or she can see the monument axially but to reach it one has to walk through different ups and downs of pavements and cross an artificial lake by a bridge-all these represent the struggle for independence.The project was constructed in three phases. The first one, began in 1972, involved in acquiring land and constructing road for the project at a cos t of Tk 26 lacs. During the second phase, 1974 - 1982, Tk 3.77 crores were spent in order to build the mass-graves, helipad, parking space, pavements etc. In the third phase, began in August 1982, the main structure was built apart from the artificial lake, green belt, cafeteria, housing etc. The third phase required Tk 848.65 lacs. The Public Works Department of the Government of Bangladesh supervised the construction of the project.
0 comments:
Post a Comment